Significant price hikes on 5090, L40S and Enerperise Blackwell Series GPUs continues into Q1 2026. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. For US customers; before placing an order for any crypto miners, inquire with a live chat sales rep or toll-free phone agent about any potential tariffs. HGX B200 lead times are now between 8-20 weeks for Golden Sku selections, with custom BOMs exceed 26 weeks. HGX H200 offerings in stock, as well as limited HGX B300. We are now certified partners of Supermicro in both NA and MENA regions.
0%
| B6D Tank (Technical Specifications) | Value |
|---|---|
| Outer Size | 1420(L) x 575(W) x 620(H) mm |
| N.W. / G.W. (B6) | 130kg / 180kg |
| N.W. / G.W. (B6D) | 110kg / 166kg |
| Total Weight | 230kg (with coolant and miners) |
| Input Voltage | 3-phase 350-480V 50/60Hz |
| Single-phase 200-277V 50/60Hz | |
| Output Voltage | Single-phase 200-277V 50/60Hz |
| Cooling Capacity | 30kW @ 30°C |
| Power Usage | 400W (Max) |
| Operating Temperature | -10°C to 40°C |
| Display | 1.32” OLED Screen |
| Coolant Volume | 174L |
| Capacity | 6 ASIC Miners |
| Network | 100Mbps Ethernet Switch |
| External Cooling | Dry Cooler/Water Cooling Tower |
| Pipe Diameter | DN25 (External Thread Diameter 32mm) |
| Max Inlet/Outlet Temp | 45/60°C |
| Noise (INoise) | 55dB(A) at 10m Distance |
| B6D Dry Cooler (Technical Specifications) | Value |
|---|---|
| Outer Size | 1560(L) x 440(W) x 952(H) mm |
| N.W. / G.W. | 117kg / 133kg |
| Input Voltage | Single-phase 200-240V 50/60Hz |
| Heat Transfer | 30kW @ 25°C |
| 20kW @ 35°C | |
| Operating Temperature | -10°C to 40°C |
| Coolant Capacity | 14L |
| Power | 580W x 2 |
| Air Volume | 13,000m³/h |
| Noise | 71dB(A) at 10m Distance |
| Pipe Diameter | DN25 (External Thread Diameter 32mm) |
| Pipeline Length | 5m x 2 |
| B6R Rack (Specification) | Value |
|---|---|
| Outer size | 1519(L) * 614(W) * 2060(H) mm |
| Capacity | B6x2 |
No reviews available.