Price for 6000 Blackwell series cards have stabilized after 3 consecutive 30% baseline hikes by Nvidia in 2026 and are expected to maintain through the rest of 2026. Supply remains strained. Please note that compliance is mandatory on all AI enterprise compute GPUs and Servers and end-user forms must be filled out before we can share any quotes. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. HGX B200/B300 lead times are now between 8-14 weeks for Golden Sku, with custom BOMs exceed 20 weeks. For DRAM and SSD bulk orders, please inquire in the chat.
Download the brochure in the downloads tab for specifications and details.
All sales final. No cancellations or returns. 4 units fit in one 40 foot shipping container, and is currently about $12,500 USD to continental USA. We ship globally. Lead time as of October 2022 is 8-10 weeks plus transit.
Verified reviews from real customers on Trustpilot
The high-voltage cable of the transformer is connected to the transformer through a cable connector in the high-voltage bin, and the low-voltage cable is connected with a bolt and a low-voltage terminal in the low-voltage bin.


| Parameter | Details |
|---|---|
| Place of origin | Beijing, China |
| Brand Name | Daelim Belefict |
| Phase | Three |
| Usage | Power |
| Coil Structure | TOROIDAL |
| Coil Number | 2 |
| Type | Oil Filled Transformer |
| Material | Copper/Aluminium |
| Input Voltage | 34.5KV or others |
| Cooling Method | ONAN |
| Rated Capacity | 2500kv or others |
No file available
No reviews available.