Significant price hikes on 5090, L40S and Enerperise Blackwell Series GPUs continues into Q1 2026. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. For US customers; before placing an order for any crypto miners, inquire with a live chat sales rep or toll-free phone agent about any potential tariffs. HGX B200 lead times are now between 8-20 weeks for Golden Sku selections, with custom BOMs exceed 26 weeks. HGX H200 offerings in stock, as well as limited HGX B300. We are now certified partners of Supermicro in both NA and MENA regions.
0%
HPC/AI Server – AMD EPYC™ 7742 – 4U DP HGX™ A100 8-GPU
Server Specifications:
– Model: GIGABYTE G492-ZD0
– GPUs: 8x Nvidia A100 80GB SXM4
– CPU: 2x AMD EPYC 7742 (64 cores each)
– Memory: 16x 32GB 3200MHz DDR4 (512GB total)
– Network: 8x CONNECTX-7 NDR 200 Gbps NICs
– Still under Gigabyte warranty until February 2025.
The next generation of AMD EPYC has arrived, providing incredible compute, IO and bandwidth capability – designed to meet the huge demand for more compute in big data analytics, HPC and cloud computing.
Built on 7nm advanced process technology, allowing for denser compute capabilities with lower power consumption
Up to 64 core per CPU, built using Zen 2 high performance cores and AMD’s innovative chiplet architecture
Supporting PCIe® 4.0 with a bandwidth of up to 64GB/s, twice of PCIe 3.0
Embedded security protection to help defend your CPU, applications, and data

NVIDIA HGX™ A100 8-GPU 40GB/80GB module
6 x PCIe x16 (Gen4 x16) low-profile slots, from PEX88096
1 x PCIe x16 (Gen4 x16) low-profile slot, from CPU_0
1 x PCIe x16 (Gen4 x16) low-profile slot, from CPU_1
3+1 3000W 80 PLUS Platinum redundant power supplies
AC Input:
– 115-127V~/ 14.2A, 50-60Hz
– 200-220V~/ 15.8A, 50-60Hz
– 220-240V~/ 14.9A, 50-60Hz
DC Input:
– 240Vdc/ 14A
DC Output:
– Max 1450W/ 115-127V~
+ 54V/ 26.6A
+ 12Vsb/ 3A
– Max 2900W/ 200-220V~
+ 54V/ 53.4A
+ 12Vsb/ 3A
– Max 3002.4W/ 220-240V~ or 240Vdc Input
+ 54V/ 55.6A
+ 12Vsb/ 3A
Note: The system power supply requires C19 type power cord.
Ubuntu 16.04.6 LTS (x64) or later
Ubuntu 18.04.3 LTS (x64) or later
Ubuntu 20.04 LTS (x64) or later
VMware ESXi 6.5 EP15 or later
VMware ESXi 6.7 Update3 or later
VMware ESXi 7.0 or later
VMware ESXi 8.0 or later
Citrix Hypervisor 8.1.0 or later
No reviews available.