Price for 6000 Blackwell series cards have stabilized after 3 consecutive 30% baseline hikes by Nvidia in 2026 and are expected to maintain through the rest of 2026. Supply remains strained. Please note that compliance is mandatory on all AI enterprise compute GPUs and Servers and end-user forms must be filled out before we can share any quotes. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. HGX B200/B300 lead times are now between 8-14 weeks for Golden Sku, with custom BOMs exceed 20 weeks. For DRAM and SSD bulk orders, please inquire in the chat.Important Notice: We have detected scammers impersonating Viperatech; please verify all payment requests and contact us through our official channels.
OIT 200A PDU Intelligent ON/OFF 3phase 3xC13 30XC19 415V Smart PDU Power Distribution Unit for Immersion Cooling and Rack Systems. 2 year warranty included. CE, RoHS, cUL, CSA rated.
1. Remote Network Management
A. Cascade Management (SNMP V1.V2.V3)
B. Wifi Connecting
C. Data Graphical Display
D. User Management
E. The Log Saved
F. Multiple Alarm Mode
G. Access Management,By Telnet,Ssh Or Modbus-Rtu
H. Multiple Output Options
2. Monitoring Function
A. Input Voltage
B. Total Load Current
C. Total Power (KW)
D. Energy Consumption (KWH)
E. Total Power Factor
F. Each Outlet Power Draw
G. Each Unit Energy Consumption
3. Control Function
A. On / Off Control For Each Outlet
B. On / Off Time Setting For Each Outlet
C. Boot Time Delay Setting
D. Set Current Limit For Each Outlet
E. Overload Protection (Automatic Power-Off)
Lead time 3 weeks. For bulk inquiries, consult a live chat agent or call our toll-free number.
Verified reviews from real customers on Trustpilot

Engineered for immersion cooling and rack systems, the OIT 200A PDU offers intelligent on/off control and monitoring capabilities. With remote network management features like SNMP compatibility, WiFi connectivity, and graphical data display, users can efficiently manage their power distribution setup. The unit, backed by a 2-year warranty and certified with CE, RoHS, cUL, and CSA ratings, ensures reliability and compliance. Its monitoring function tracks key metrics like input voltage, load current, power consumption, and power factor, while the control function enables precise outlet control, time settings, and current limits, ensuring optimal performance and protection against overloads.
| Parameter | Specification |
|---|---|
| Input Voltage | |
| 380V~/3 phase (LLLNG) | |
| 220V~ WYE | |
| 415V~/3 phase (LLLNG) | |
| 240V~ WYE | |
| 433V~/3 phase (LLLNG) | |
| 250V~ WYE | |
| 208V~/3 phase (LLLG) | |
| 208V~ Delta (option) | |
| 480V~/3 phase (LLLNG) | |
| 277V~ WYE | |
| Input Characteristics | |
| Input Connector | 200Ax5wires (or junction box, input breaker optional, price difference) |
| Frequency | 50/60Hz |
| Protection | Breaker |
| 30pcs/1P*20A Hydraulic Breaker | |
| Dimension | LxWxH = 147022090mm |
| Net weight | 20KG |
| Wire specification | UL certification, with flame retardant function |
| Certificate | ETL RoHS |
| Output Characteristics | |
| Total Current | Max 200A |
| Rating Output Voltage | 208-250V |
| Max Output Power per Outlet | Under 208V, Max 4160W |
| Under 220V, Max 4400W | |
| Under 240V, Max 4800W | |
| Under 250V, Max 5000W | |
| Total Output Power | WYE Max 144KW |
| Socket Standard | 30pcs C19 (Can be changed as client request) |
| Remote Control | Remote control on/off for each outlet by TCP/IP |
No file available
No reviews available.