Price for 6000 Blackwell series cards have stabilized after 3 consecutive 30% baseline hikes by Nvidia in 2026 and are expected to maintain through the rest of 2026. Supply remains strained. Please note that compliance is mandatory on all AI enterprise compute GPUs and Servers and end-user forms must be filled out before we can share any quotes. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. HGX B200/B300 lead times are now between 8-14 weeks for Golden Sku, with custom BOMs exceed 20 weeks. For DRAM and SSD bulk orders, please inquire in the chat.
✓ Unit Composition: Cabinets + CDU + 30T closed water tower
✓ Power Supply: 480V 60Hz (with power cord)
✓ Total Gross Weight: 1500 kgs
✓ Total CBM: 14 cbm
✓ Lead Time: 10-20 Days
✓ Remark: the price not included the pipes, because we’re not sure the distance and layout that the customer wants to place, so we suggest to buy the water pipes in local market.
Please note that shipping costs will be quoted and charged separately (by air or sea) and can vary greatly depending on location, quantity and method. All sales final. No returns or cancellations. For bulk inquiries, consult a live chat agent or call our toll-free number.
Verified reviews from real customers on Trustpilot
| Specification | 16-units + 20T Closed Water Tower | 16-units + 80KW Dry Cooler | 28-units + 30T Closed Water Tower | 28-units + 200KW Dry Cooler |
|---|---|---|---|---|
| Unit Composition | Cabinet + 20T closed water tower | Cabinet + 80KW dry cooler | Cabinets + CDU + 30T closed water tower | Cabinets + CDU + 200KW dry cooler |
| Power Supply | 480V 60Hz (with power cord) | 480V 60Hz (with power cord) | 480V 60Hz (with power cord) | 480V 60Hz (with power cord) |
| Total Gross Weight | 1140 kgs | 750 kgs | 1500 kgs | 1200 kgs |
| Total CBM | 9 cbm | 8 cbm | 14 cbm | 11 cbm |
No file available
No reviews available.