Significant price hikes on 5090, L40S and Enerperise Blackwell Series GPUs continues into Q1 2026. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. For US customers; before placing an order for any crypto miners, inquire with a live chat sales rep or toll-free phone agent about any potential tariffs. HGX B200 lead times are now between 8-20 weeks for Golden Sku selections, with custom BOMs exceed 26 weeks. HGX H200 offerings in stock, as well as limited HGX B300. We are now certified partners of Supermicro in both NA and MENA regions.
✓ Dimensions (LWH) (mm): 12192*2438*2896
✓ Operating Weight (+): 23
✓ Coolant Volume (L): 13000
✓ Circulation Mode (L): Single loop
✓ Supported Qty of Miners: 384 S19/480 M50
✓ Qty of Tanks: B24 Tank*16
✓ Operating Temperature (°C): -25 ~ 55 (**) ,
✓ Input Voltage: 3-phase 350-480V 50/60Hz
✓ Max Power Load (MW): 1.58
✓ Output Voltage: 3-phase 350-480V 50/60Hz
✓ Certification: CE/UL
✓ Nominal Power for Cooling (kW): 96
✓ Power Distribution Cabinets Current (A): 1200A*2
✓ PDU Smart Meter: *16
✓ Cooling Capacity (MW): 1.34
✓ Cooling Type: Closed-circle water cooling tower / Dry cooler
✓ Inlet Temperature (°C): 45
✓ Outlet Temperature (°C): 60
✓ Design Reference Temperature (°C): 30
Lead time is 45 days. Shipping will be quoted separately at the time of loading as costs change weekly. Expect door-to-door shipping to range between $14,000-$17,000 USD to North America, and slightly less for Middle East. Buyer is responsible for renting crane to offload container from flatbed.
| Specification | BC40 | BC20 | BC10 | BC10 Semi |
|---|---|---|---|---|
| Basic/Pro | Basic | Pro | Basic | Pro |
| Dimensions (LWH) (mm) | 1219224382896 | 582024382896 | 299124382591 | 299124382591 |
| Shipping Weight (T) | 13 | 7 | 3 | 2 |
| Weight (T) | 23 | 12 | 6 | 4 |
| Coolant Capacity (L) | 14000 | 7000 | 3600 | 1800 |
| Circulation Mode | Single loop | Single loop | Single loop | Single loop |
| Miner Capacity | 13384 S19/M50 | 384 S19/480 M50 | 192 S19/M50 | 192 S19/240 M50 |
| 96 S19/120 M50 | ||||
| 48 S19/60 M50 | ||||
| Tank Quantity | B24 Tank * 16 | B24 Tank * 8 | B24 Tank * 4 | B24 Tank * 2 |
| Temperature | -25° C~40° C | -25° C~40° C | -25° C~40° C | -25° C~40° C |
| Electrical Performance (- /√ optional/standard) | ||||
| Input Voltage and Frequency | 3-phase 350-480V 50/60Hz | 3-phase 350-480V 50/60Hz | 3-phase 350-480V 50/60Hz | 3-phase 350-480V 50/60Hz |
| Max Power Load (kW) | 1693 | 2833 | 889 | 1411 |
| Output Voltage and Frequency | Single-phase 200-277V 50/60Hz | Single-phase 200-277V 50/60Hz | Single-phase 200-277V 50/60Hz | Single-phase 200-277V 50/60Hz |
| Certification | CE/UL | CE/UL | CE/UL | CE/UL |
| Power (kW) | 100 | 134 | 50 | 67 |
| Power Distribution Cabinets (A) | 1200Ax1 *2 | 1000Ax2 *2 | 630Ax1 *2 | 1000Ax1 *2 |
| 630Ax1 *1 | ||||
| 1000Ax1 *1 | ||||
| 400Ax1 *1 | ||||
| 630Ax1 *1 | ||||
| PDU | Smart PDU*16 | Smart PDU*32 | Smart PDU*8 | Smart PDU*16 |
| Smart Meter | - | √ | - | √ |
| Integrated Wiring | √ | √ | √ | √ |
| Network | √ | √ | √ | √ |
| UPS | - | - | - | - |
| SPD | √ | √ | √ | √ |
| Cooling Capacity (kW) | 1440 | 1920 | 720 | 960 |
| Cooling Type | Closed water cooling tower / Dry cooler | Closed water cooling tower / Dry cooler | Closed water cooling tower / Dry cooler | Closed water cooling tower / Dry cooler |
| Inlet Temperature (° C) | 45 | 45 | 45 | 45 |
| Outlet Temperature (° C) | 60 | 60 | 60 | 60 |
| Design Reference Temperature (° C) | 35 | 35 | 35 | 35 |
| Container Components (- /√ optional/standard) | ||||
| LED Lighting System | √ | √ | √ | √ |
| Ventilation System | √ | √ | √ | √ |
| Air Filter | √ | √ | √ | √ |
| Remote Temperature Sensors | √ | √ | √ | √ |
| Remote Smoke Sensors | √ |