Price for 6000 Blackwell series cards have stabilized after 3 consecutive 30% baseline hikes by Nvidia in 2026 and are expected to maintain through the rest of 2026. Supply remains strained. Please note that compliance is mandatory on all AI enterprise compute GPUs and Servers and end-user forms must be filled out before we can share any quotes. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. HGX B200/B300 lead times are now between 8-14 weeks for Golden Sku, with custom BOMs exceed 20 weeks. For DRAM and SSD bulk orders, please inquire in the chat.
Important note: All Antboxes are made to order with a production time of about 30 days. Ocean freight can take between 15-40 days depending on port of entry. Vipera will absorb the 25% import tariff for customers in the United States. Vipera can use its own freight forwarder for every order, and shipping costs are an extra consideration and will be billed at time of completion. Client must provide 3-phase power or transformer, flat concrete slab for placement, crane for placement, fire extinguisher, smoke detector, canopy and cabling ladder. 5 panel assembly required.
Verified reviews from real customers on Trustpilot

| Parameter | Details |
|---|---|
| Rating Power | 1 Megawatt |
| Place of Origin | China |
| Style | Shipping Container |
| Interface Type | USB/NEMA |
| Warranty (Year) | 365 days |
| Product name | Miner Container |
| Power | 1,200 KW |
| Dimensions | 1205.8X243.8X289.6 cm |
| Temperature | -30°C – 40°C |
| Outdoor Rated | Yes |
No file available
No reviews available.