Significant price hikes on 5090, L40S and Enerperise Blackwell Series GPUs continues into Q1 2026. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. For US customers; before placing an order for any crypto miners, inquire with a live chat sales rep or toll-free phone agent about any potential tariffs. HGX B200 lead times are now between 8-20 weeks for Golden Sku selections, with custom BOMs exceed 26 weeks. HGX H200 offerings in stock, as well as limited HGX B300. We are now certified partners of Supermicro in both NA and MENA regions.
0%
This is a preorder for the June production batch, with tentative delivery at end of June, 2024. All sales final. No returns or cancellations. For bulk inquiries, please consult a live chat agent or call our toll-free number.

The L7 Pro comes with power supply attached, as with most 4th generation ASICs. The power supply does not come with the 2 power cords necessary however as they are regional spec. Every requires a2-pole 20 amp breaker circuit, feeding a 220-240v line. Power chords must be 10A 14-16AWG rates NEMA digital ballast type. There is no difference between the 9.16 and 9.5 rated models-- they are essentially the same unit. Bitmain does not guarantee shipments of L7 capable of mining exactly 9.5GHs consistently. This figure is simply considered the high-end hashrate, with 9160 representing the low-end.

| Attribute | Details |
|---|---|
| Version | L7 |
| Hashrate, MH/s | 8550 – 9500 |
| Power on wall @25°C, Watt | 3425 |
| Miner Size (LengthWidthHeight) | 370195.5290 mm (w/o package) |
| Net weight | 15 kg |
| Including PSU size | (1-1) |
| Including PSU weight | (1-2) |
| Algorithm | Scrypt |
| Weight | 16.5 kg |
| Series | Antminer |
No reviews available.