Price for 6000 Blackwell series cards have stabilized after 3 consecutive 30% baseline hikes by Nvidia in 2026 and are expected to maintain through the rest of 2026. Supply remains strained. Please note that compliance is mandatory on all AI enterprise compute GPUs and Servers and end-user forms must be filled out before we can share any quotes. Please note Credit Card payments will only work if USD or AED currency is selected on top right corner of the website. HGX B200/B300 lead times are now between 8-14 weeks for Golden Sku, with custom BOMs exceed 20 weeks. For DRAM and SSD bulk orders, please inquire in the chat.
Weight: 16.5kg
Hashrate: 8800M
Version: L7
Algorithm: Scrypt
Consumption: 3425W
This is a preorder for the June production batch, with tentative delivery at end of June, 2024. All sales final. No returns or cancellations. For bulk inquiries, please consult a live chat agent or call our toll-free number.
Verified reviews from real customers on Trustpilot
The L7 Pro comes with power supply attached, as with most 4th generation ASICs. The power supply does not come with the 2 power cords necessary however as they are regional spec. Every requires a2-pole 20 amp breaker circuit, feeding a 220-240v line. Power chords must be 10A 14-16AWG rates NEMA digital ballast type. There is no difference between the 9.16 and 9.5 rated models-- they are essentially the same unit. Bitmain does not guarantee shipments of L7 capable of mining exactly 9.5GHs consistently. This figure is simply considered the high-end hashrate, with 9160 representing the low-end.

| Attribute | Details |
|---|---|
| Version | L7 |
| Hashrate, MH/s | 8550 – 9500 |
| Power on wall @25°C, Watt | 3425 |
| Miner Size (LengthWidthHeight) | 370195.5290 mm (w/o package) |
| Net weight | 15 kg |
| Including PSU size | (1-1) |
| Including PSU weight | (1-2) |
| Algorithm | Scrypt |
| Weight | 16.5 kg |
| Series | Antminer |
No file available
No reviews available.